JOPROBAS Innovative Consultant (JORIP
PROKOSHOL O BASTOBAYON LIMITED) is proud to be associated with Bangladesh
Inland Water Transport Authority (BIWTA) through our specialized involvement in
comprehensive industrial engineering, advanced surveying, mapping, hydrographic
investigations, and infrastructure development works across multiple strategic
riverine locations in Bangladesh.
Our extensive portfolio dedicated to this
initiative encompasses the Walk-way Project. For this project, we have
successfully executed river boundary pillar determination based on Mouza
mapping along the rivers surrounding Dhaka—specifically the Shitalakshya,
Buriganga, Turag, and Balu rivers—along with detailed topographical surveys,
hydrographic surveys, aerial surveys with drone video reports, layout work
(stake out), and as-built data collection, delivering high-precision geospatial
and surveying solutions tailored to the rigorous operational requirements of
riverbank management and pedestrian walkway infrastructure.
These prestigious assignments are executed
with rigorous adherence to international quality guidelines. Our
multidisciplinary technical team provides end-to-end surveying, geospatial
analysis, structural assessments, hydrographic profiling, and meticulous
on-site planning to ensure seamless execution from inception to completion.
●
Establishment
Temporary Benchmark: Implemented
utilizing high-precision RTK GNSS, Total Station, and Level Machines.
●
Detailed
Topographical Survey: Comprehensive
terrain and elevation mapping for accurate project planning.
●
Hydrographic
Survey: Advanced bathymetric and
riverbed profiling for water resource and aquatic engineering.
●
Drone Image /
Aerial Survey & Video Report:
High-resolution Orthomosaic imaging and aerial video reporting capturing
detailed perspectives.
●
Cadastral Mapping
& Boundary Demarcation: Mouza-based
river boundary pillar determination and georeferencing onto survey maps
complete with a structured database.
●
Layout Work
(Stake Out) & As-Built Data: Precise
on-site setting out and comprehensive as-built verification data collection.
For the Walk-way Project with BIWTA, JOPROBAS Innovative
Consultant executed comprehensive survey and engineering works around the
rivers surrounding Dhaka, including the Shitalakshya, Buriganga, Turag, and
Balu rivers. Our specialized scope of work and features for this project
included:
●
River Boundary
Pillar Determination: Established River
boundary pillars based on Mouza mapping and official land records along the
Shitalakshya, Buriganga, Turag, and Balu rivers.
●
Detailed
Topographical Survey: Conducted precise
terrain and elevation mapping for accurate alignment of the walk-way
structures.
●
Hydrographic
Survey: Performed bathymetric and
riverbed profiling to assess water depths and underwater topography.
●
Aerial Survey
& Drone Video Reporting: Captured
high-resolution aerial imagery and comprehensive drone video reports for
progress tracking and visual analysis.
●
Layout Work
(Stake Out): Implemented accurate
on-site layout and stakeout works for precise alignment execution.
●
As-Built Data
Collection: Gathered comprehensive
as-built survey data to ensure compliance with design specifications upon
completion.
●
Delivery of
high-precision engineering surveys and technical documentation.
●
Ensuring strict
workplace safety standards and environmental compliance.
●
Optimizing resource
allocation and structural efficiency for industrial and riverine growth.
●
Integration of
modern technological frameworks to minimize operational latency.
Our extensive participation across multiple
prestigious projects of BIWTA demonstrates JOPROBAS Innovative Consultant's
unwavering commitment to quality, precision, and international best practices
in complex riverine, environmental, and infrastructure development.
We welcome collaboration with local and international
partners for future infrastructure and consultancy projects.